p9

Installation of Biogas Plant to Produce 65,000 m3/day of Biogas for Pak Ethanol (Pvt.) Ltd.

p2-1

Installation Carbon Dioxide Recovery Plant for Pak Ethanol (Pvt.) Ltd.

p3-1

Establishment of Ethanol Distillery Line – II for Pak Ethanol (Pvt.) Ltd., Matli

p4-1

Installation of High Pressure Boiler and 4.4 Megawatt Power Plant for Pak Ethanol (Pvt.) Ltd.

Installation Carbon Dioxide Recovery Plant for Pak Gases (Pvt.) Ltd.

Back to top